CJEU confirms incompatibility between automatic judicial inhibition rules and references for a preliminary ruling: need for reform? (C-614/14)

In its Judgment of 5 July 2016 in Ognyanov, C-614/14, EU:C:2016:514, the Court of Justice of the European Union (CJEU) has taken a final decision on whether domestic (criminal) procedural rules concerned with safeguards against judicial bias need to be set aside if their application is such as to jeopardise the functioning of the system of referrals for a preliminary ruling in the interpretation of EU law established by Article 267 TFEU.

It is worth stressing that the case at hand concerned criminal law enforcement in Bulgaria, where a domestic rule concerning breaches of judicial impartiality could be interpreted so as to require a referring national court that had laid out the factual background and the law applicable to the case for the purposes of the reference to the CJEU, to inhibit itself from any further decisions in a criminal case (and face disciplinary action).

In short, the CJEU has followed the Opinion of AG Bot (see here) and has decided that such a rule is incompatible with EU law and that the domestic courts not only cannot be obliged to refrain from taking any further decisions in a given criminal case on the basis that they referred a preliminary question to the CJEU where they laid out the facts of the case and the law applicable to them, but they are also prevented from voluntarily stepping down of the case on the basis that they consider themselves biased after having referred the question to the CJEU.

I do not have much of an issue with the first part of the Judgment, where the CJEU considers contrary to EU law a rule implying that any referral of a case for a preliminary ruling is a ground for automatic judicial recusal or inhibition; but I find the second part of the CJEU's decision worrying because the opposite position, whereby a judge cannot recuse herself on the basis of a bias created or identified at the point of sending the request for a preliminary ruling, or whereby she would be breaching EU law if she decided to inhibit herself from any further decision in the case, cannot be right.

In my view, the main issue with the Ognyanov Judgment derives from the (logical) formality of the CJEU's reasoning. After having determined that 'a national rule which is interpreted in such a way as to oblige a referring court to disqualify itself from a pending case, on the ground that it set out, in its request for a preliminary ruling, the factual and legal context of that case' is contrary to EU law, the CJEU engaged in the analysis of whether that rule could be applied voluntarily by the court concerned on the basis that 'that rule ensures a higher degree of protection of the parties’ fundamental rights'. The CJEU analysis was as follows:

32 ...  the fact that a national court sets out, in the request for a preliminary ruling ... the factual and legal context of the main proceedings is not, in itself, a breach of [the right to a fair trial]. Consequently, the obligation to disqualify itself, imposed by that rule on a referring court which has, in a reference for a preliminary ruling, acted in that way cannot be considered as serving to enhance the protection of that right.
36 ... in this case, the referring court is obliged to ensure that Article 267 TFEU is given full effect, and if necessary to disapply, of its own motion [the domestic rule requiring its inhibition] where that interpretation is not compatible with EU law (see, to that effect, judgment of 19 April 2016, DI, C‑441/14, EU:C:2016:278, paragraph 34).
37      In the light of the foregoing, ... EU law must be interpreted as precluding a referring court from applying a national rule, such as that at issue in the main proceedings, which is deemed to be contrary to EU law (C-614/14, paras 32 and 36-37, emphasis added).

In my view, the biggest issue with the Ognyanov Judgment is that the CJEU seems to only take into account one of two possibilities. It is certainly true that, as the CJEU emphasises, setting out the factual and legal context of the main proceedings to which the request for a preliminary refers 'is not, in itself [always or necessarily], a breach of that fundamental right', but it is not less true that the way in which a court lays out such factual and legal context can be sufficient to establish the existence of judicial bias because the referring court may demonstrate that it has pre-judged the issues at stake and thus expressed a legal position that prevents it from remaining involved in the criminal investigation without jeopardising the fundamental rights of the accused. Therefore, a more nuanced approach is needed.

I would suggest that a careful holistic interpretation of the Ognyanov Judgment could result in such nuanced approach, particularly if it was understood that the CJEU only considers contrary to EU law for a domestic court to inhibit itself from any further decisions in an on-going (criminal) case exclusively on the basis that it had laid down the factual and legal context of that case for the purposes of the request for a preliminary ruling--that is, exclusively in view of its having met the requirements of Art 267 TFEU and Art 94 of the rules on procedure--but it does not consider the same incompatibility with EU law if the domestic court identifies any (additional) substantive (and substantial?) indication of (its own) bias in the way that factual and legal background is laid out.

It certainly seems wrong to me to adopt a broader reading of the Ognyanov Judgment whereby any judicial inhibition (or recusal) on the basis of bias shown within the context of a request for a preliminary ruling is barred as a matter of (non)compliance with EU law.

Ultimately, and beyond these considerations, in my view, the difficulties derived from the reconciliation of domestic rules on judicial impartiality (in criminal law matters) and the EU preliminary reference mechanism seem to be more than a good reason to revisit the assumption that the same rules can apply without causing significant problems for civil/administrative and criminal references for a preliminary ruling to the CJEU.

GC opens dangerous door to post-challenge / after-the-fact 'rationalisation' of public procurement evaluations (T-349/13)

In its Judgment of 4 July 2016 in case Orange Business Belgium SA v Commission, T-349/13, EU:T:2016:385, the General Court (GC) dealt with a highly technical challenge of a procurement decision concerning IT services. The GC Judgment is interesting in a broader context, though, as it deals with the very tricky question of the level of precision that evaluation teams need to employ when they draft evaluation documents and the possibility to take into account post-challenge (after-the-fact) 'rationalisations' of the original tender evaluations.

In the case at hand, the relevant dispute concerned the misapplication of an award sub-criterion for the assessment of IT network performance (service level agreement, or SLA). In my view, the relevant points to note are that:

  1. According to the tender documentation, as clarified by a "Questions and Answers" document published by the contracting authority following a request for clarification of the applicable award criteria and sub-criteria, the specific sub-criterion 6b was to be assessed as follows: "Points will be granted for the [RTD] and the [MF] separately, comparing the results of all bidders. To obtain the overall evaluation both points will be multiplied. To obtain the overall points, the evaluation result will be multiplied by a factor and rounded in order to obtain 10 points for the best bidder" (T-349/13, para 62; NB: what RTD and MF means is not relevant for our discussion).
  2. As regards award sub-criterion 6b, the applicant’s tender was evaluated as follows: ‘The provided [MF] [confidential] for the calculation of network performance [SLA] liquidated damages was considered EXCELLENT’ (T-349/13, para 64).
  3. According to the extract from the evaluation report concerning the successful tender, ‘the provided [MF] (redacted data) for the calculation of network performance SLA liquidated damages was welcomed and therefore the evaluation committee quoted the quality of the network performance SLA as VERY GOOD’ (T-349/13, para 65).

Thus, in basic terms, the main ground underlying the applicant's challenge is that the contracting authority deviated from its disclosed award criteria. Specifically, '[t]he main point of disagreement between the parties relates to whether the Commission [as contracting authority] had taken into account not only the information concerning the MF, but also the information concerning the RTD for the evaluation of the tenders in the light of award sub-criterion 6b' (T-349/13, para 69).

Remarkably, the GC establishes that '[i]t is apparent from reading the extract of the evaluation report which referred directly to award sub-criterion 6b that the information concerned indeed only the MF ... The Commission [as contracting authority] indeed accepts this moreover'. In my view, this would (and should) be sufficient to end the legal analysis and move on to whether the deviation from the disclosed award criteria is material and, if so, whether sticking to the disclosed criteria would have altered the award decision. However, this is not the analytical route followed by the GC.

Controversially, in order to assess this claim, the GC relies on the additional examination report (a further evaluation document) prepared by the contracting authority after the initial challenge of the evaluation by the disappointed bidder. Indeed, the GC takes into account that

it is expressly apparent from the additional examination report that the RTD was taken into consideration in order to evaluate the tenders in the light of award sub-criterion 6b. The fact that that report is subsequent to the award decision cannot affect either the validity or reliability of the comments set out therein (sic). It must be noted that Article 171(1) of the Rules of Application provides for the possibility of carrying out an additional examination if expressly requested by the unsuccessful tenderers. That provision would be rendered inoperative if every additional examination of that type were automatically deemed biased or subject to caution (T-349/13, para 75, emphasis added, emphasis added).

The GC also relies in a table produced by the contracting authority only in its defence document, which the contracting authority confirmed 'had been drawn up during the administrative procedure and before the present action was brought' (T-349/13, para 75, paras 76-78).

Overall, then, the GC's dismissal of this specific ground for challenge rests (at least partially) on reliance on a post-challenge additional examination report and an undated evaluation table self-certified to pre-date the challenge by the defending contracting authority. There are more issues concerning both the facts of the evaluation process and the debriefing meetings, but I do not think it is necessary to focus on them to discuss the GC approach from a general standpoint.

In my view, it is very dangerous to open the door to post-challenge (after-the-fact) rationalisations of evaluation documents. It is also evidentiary very weak to accept a document produced by one of the parties and take it at face value to have been prepared at an indetermined time 'during the administrative procedure and before the present action was brought'. The same way that significant restrictions have been developed in the case law to ensure that tenderers do not alter their tenders under the excuse that they are actually only 'clarifying' them (which has admittedly resulted in a grey zone that still requires further guidance), one would expect the same level of scrutiny for evaluation documents.

I am not advocating for absolute strictness in the interpretation of the evaluation reports, as the information they convey is oftentimes complex and open to (re)interpretation, but I think that the GC has moved way too far in granting such a degree of deference to the contracting authority in this case.

At the end of the day, if the evaluation audit trail cannot be guaranteed and challengers of procurement decisions can be undermined by the production of additional 'rationalisations' of defective evaluation reports, the remedies system will be severely damaged and the integrity of public procurement processes put at risk. Thus, a much tighter approach to the dating/timing of documents (one of the much awaited advantages of eProcurement and time-stamping), and an analysis of the evaluation reports that recognises obvious limitations and omissions as insufficient to support any 'reinterpretation' seems much preferable. Particularly because such an approach would provide evaluation teams the right incentives to do a proper job documenting their decisions from the outset and throughout the procurement procedure, which can only result in strengthened procedural robustness and (hopefully) improved decision-making.

For these reasons, at least from the perspective of the first principles applicable to a robust bid protest system capable of ensuring an acceptable level of procedural integrity, I consider the GC Judgment in Orange Business Belgium SA v Commission a very dangerous decision and would very much favour its annulment in case it got further appealed.

AG delineates boundaries of administrative proportionality assessments and intensity of judicial review requirements under EU public procurement law (C-171/15)

In his Opinion of 30 June 2016 in Connexxion Taxi Services, C-171/15, EU:C:2016:506, Advocate General Campos Sánchez-Bordona has addressed two important issues concerning the judicial review of a decision not to exclude an economic operator that had potentially incurred in serious professional misconduct despite the tender documentation indicating that 'A tender to which a ground for exclusion applies shall be set aside and shall not be eligible for further (substantive) assessment'.

The preliminary reference sent to the Court of Justice of the European Union (CJEU) mainly raises two issues: firstly, whether it was possible for the contracting authority to apply a proportionality assessment before proceeding to exclude the economic operator--or, in the circumstances of the case, in order to decide not to exclude. And, secondly, whether EU law precluded national courts from solely engaging in ‘marginal’ review as to whether the contracting authority could reasonably have come to the decision not to exclude a tenderer notwithstanding the fact that that it was guilty of grave professional misconduct, rather than carrying out an ‘unrestricted’ judicial review of the assessment conducted on the basis of the principle of proportionality. Both are interesting issues. Both were to be decided under the 2004 EU public procurement rules, but both are clearly relevant under the revised 2014 package.

Again on the interaction between general (administrative) law and tender documentation

The first issue fundamentally stems from the fact that applicable Dutch law and its interpretative guidance foresee that 'the assessment of whether a tenderer must actually be excluded, having regard to the general principles of Directive 2004/18, must always be proportional and be carried out in a non-discriminatory manner' (Opinion in C-171/15, para 10). In the Connexxion Taxi Services case, the contracting authority engaged in such proportionality assessment despite having published tender documentation that seemed to create an automatic obligation to exclude by stating that: 'A tender to which a ground for exclusion applies shall be set aside and shall not be eligible for further (substantive) assessment'. As a result of the proportionality analysis, it decided not to exclude a tenderer competing with Connexxion , according to which 'the contracting authority [was] not in a position to make an assessment of proportionality having found that the tenderer [had] been guilty of grave professional misconduct. That assessment [had] already been carried out by inclusion of the misconduct as a ground for exclusion in the descriptive document. Given the wording of the latter, it would be contrary to the principles of public access, transparency and equality in matters of administrative procurement for the contracting authority to have the power to assess the proportionality of the ground for exclusion.' (para 30). 

Somehow, this raises a question that can be seen as the mirror image of the controversy underlying the recent Pizzo Judgment (C-27/15, EU:C:2016:404, see comments here). In Pizzo, the contracting authority sought to rely on generally applicable administrative law rules to exclude economic operators. The CJEU ruled against that possibility and created a middle-path whereby a contracting authority seeking to engage in that exclusion would need to provide the tenderer an opportunity to regularise its position and comply with that general obligation within a period of time set by the contracting authority. Conversely, in Connexxion Taxi Services, the CJEU is expected to rule on whether reliance on generally applicable administrative law rules can be used to deactivate specific exclusion choices established in the tender documentation. AG Campos submits that the Court should answer in the affirmative and that this is not contrary to Pizzo. I agree.

In his Opinion, AG Campos stresses that

51. The requirement included in paragraph 3.1 of the descriptive document (‘a tender to which a ground for exclusion applies must be set aside’), precisely because of its quasi-regulatory nature, must, in my view, be read in the light of the interpretative rules applicable to all subordinate legal rules, which cannot disregard the more general rules which govern them. If the [applicable rule] provides that exclusion on the ground of grave professional misconduct requires that the contracting authority examine each particular case ‘on the basis of the nature and size of the public contract, the type and scope of the misconduct and the measures taken in the meantime by the undertaking’, the fact that the descriptive document is silent as to that necessary and individual application of the principle of proportionality cannot result in that principle being disregarded.
52. That approach is confirmed from the perspective of EU law. The case-law of the Court on the optional grounds for exclusion, rejecting their automatic application, confirms the need for that consistent interpretation. It follows from the judgment in Forposta and ABC Direct Contact that automatic exclusion (of a tenderer guilty of grave misconduct) could go beyond the discretion conferred on Member States by Article 45(2) of Directive 2004/18 (Opinion in C-171/15, paras 51-52, references omitted and emphasis added).

In my view, it must be right that contracting authorities are always under a general obligation of acting in a proportionate manner and, consequently, each decision they adopt needs to be proportionate under the circumstances and pro-competitive, and ultimately 'a contracting authority must retain the power to assess, on a case-by-case basis, the gravity of the circumstances that would lead to exclusion of the tenderer. And it is submitted that it must also balance them against the effects that such exclusion would have on competition' [see A Sanchez-Graells, Public procurement and the EU competition rules, 2nd edn (Oxford, Hart, 2015) 293, references omitted]. Thus, the final consideration of AG Campos seems entirely correct when he stresses that

In the invitation to tender at issue, the conditions and the selection procedure, the same for all applicants, were not modified. The contracting authority checked that their tenders satisfied the criteria applicable to the contract and applied no ground for exclusion which was not provided for in the descriptive document. The fact that, in order to assess one of those grounds for exclusion expressly included in that document it applied the criterion of proportionality, which was not expressly referred to in the descriptive document but is required by the general ... rules on public procurement (as well as by the case-law of the Court), is, in my view, consistent with the principle of equal treatment and its corollary, the obligation to act transparently (Opinion in C-171/15, para 58, references omitted and emphasis added).

The more difficult issue of the standard of (intensity) of judicial review

The second question fundamentally focuses on the fact that, given the contracting authority's engagement in a proportionality analysis, a mere 'marginal' review of the decision in order to ascertain whether the contracting authority could reasonably have come to the decision not to exclude a tenderer could fall short of meeting the requirements of the Remedies Directive.

After some interesting remarks on the gradual increase in the requirements of intensity of judicial review in areas of EU substantive law where there has been a harmonisation of remedies--which, consequently, reduce the scope of limitations derived from the general principle of procedural autonomy--AG Campos enounces what he considers should be covered by a mechanism of review compliant with the Remedies Directive. In his view,

the judicial review imposed by Directive 89/665 requires something more [than a mere 'marginal' review, or solely assessing whether or not the contested decision was arbitrary] to deserve that name. The assessment by the court cannot end with a mere assessment of the ‘reasonableness’ of the contested decisions, especially as those decisions must comply with detailed rules covering formal and substantive matters. A court hearing an application in this field will have to assess whether the disputed award observed the rules of the invitation to tender and whether the successful tenderer’s application can withstand the critical analysis which its competitors present in the action. That assessment will require, in many cases, verification of the decisive facts (which the administration may have determined incorrectly), as well as evidence concerning the relative merits of the various applications. It will also involve gauging whether the administrative action is duly reasoned and whether it is in line or at variance with the objectives which underlie it (in other words, whether there is evidence of misuse of powers) and the other legal provisions which govern it. Examination of all that evidence goes beyond, I repeat, a mere assessment of the ‘reasonableness’ of the contested measure and involves matters of fact and law of a more ‘technical’ and usually more complex nature, which every court having jurisdiction to review administrative acts usually carries out (Opinion in C-171/15, para 73, emphasis added). 

This leads him to suggest to the Court to declare that 

Articles 1 and 2 of Council Directive 89/665/EEC of 21 December 1989 on the coordination of the laws, regulations and administrative provisions relating to the application of review procedures to the award of public supply and public works contracts are not compatible with legislation, or the usual practice, of a Member State which limits the scope of the review procedures to a review merely of the reasonableness of the decisions of contracting authorities (Opinion in C-171/15, para 85, emphasis added).

On principle, this seems unobjectionable and, as AG Campos suggests, it would also be compatible with the CJEU decision in Croce Amica One Italia (C-440/13, EU:C:2014:2435, see comment here), where it effectively clarified that

Article 1(1) of Directive 89/665 requires the decision of the contracting authority withdrawing the invitation to tender for a public contract to be open to a review procedure, and to be capable of being annulled, where appropriate, on the ground that it has infringed EU law on public contracts or national rules transposing that law (para 34).

The question is whether (all) the specific details of the full review advanced by AG Campos in para 73 of his Opinion are necessary in order to allow the review body or court to assess compatibility of procurement decisions with EU law and domestic transposing measures. As I read his Opinion, he advocates for three main components: (1) a review of the decisive facts, (2) a review of the relative merits of the offers, (3) a review of the reasons given by the contracting authority for its choices and the soundness of those reasons (or, in his own words, to check that there has been no misuse of powers). In my view, elements (1) and (3) are relatively uncontroversial. However, element (2) is very likely to create difficulties if the review body or court is expected (or empowered) to second guess the technical evaluation of the tenderers and their tenders. I think that the risk of allowing review courts and bodies to substitute the contracting authority's discretion for their own would be going a step too far. Thus, while the minimum requirements of the review procedures mandated by the Remedies Directive clearly seem to indicate the need to go beyond a mere assessment of arbitrariness and engage in a full review of legality, it also seems clear to me that the review cannot go as far as to allow for a second-guessing of the contracting authority's discretion. 

This is clearly an area where drawing bright lines is complicated or, as AG Fennelly put it writing extra judicially,

There remains a somewhat imprecise formulation of the standard of substantive review. Respect, to the extent appropriate, is paid to the discretion of the awarding authority. Nonetheless, the cases show that the intensity of scrutiny is greater than in traditional cases, where judges have been very slow to substitute their own evaluation of the facts for that of the decision-maker. In tendering, it is natural, other things being equal, to expect the contract to be awarded to the lowest price. Even where the criterion adopted is the “most economically advantageous,” there will usually be an identifiable lowest price. It will normally be incumbent on the authority to claim that other things are not equal and to show why. Thus, the substantial justification for the decision shades into the adequacy of the reasons, even if sufficiency of reasons is usually treated as a separate ground of judicial review (emphasis added). 

It may well be that this discussion is more about the semantics than substance of how to describe the standard for judicial review. Be it as it may, however, it will be interesting to await for the final decision of the Court in the Connexxion Taxi Services case, which hopefully will bring some clarity on the specific requirements of intensity of judicial review that stem from the Remedies Directive.